S61 expressway (section: Łomża Południe - Łomża Zachód node)

Project value: 0 Type: Roads and Bridges Project status: Concluded
Description

The contract includes construction of part of the Via Baltica route - section of the Łomża bypass road between "Łomża Południe" and "Łomża Zachód" junctions. It covers 7 km 2-carriageway S61 expressway, the "Łomża Południe" junction and a 9 km section of national road No. 63 going towards Zambrów. The investment project is executed in the “design and build” system. The period of execution of the contract covers 34 months, excluding winter time in the construction period.

 

Technical information:

S61 from the "Łomża Południe" node (with a node) to the "Łomża Zachód" node (without a node):

- length - 7.186 km,

- cross-section of the expressway 2x2; lane width 3.5 m, 2.5 m emergency lanes, roadways separated by 5 m green lane,

- surface of cement concrete (thickness 27 cm),

- construction and reconstruction of rainwater drainage, technological channel, traffic management system,

- traffic category - KR6, surface load - 115 kN / axis,

- engineering structures: 1 bridge, 14 viaducts, 1 animals crossing,

- environmental protection infrastructure, including: acoustic screens, retention reservoirs, fencing of the entire expressway.

 

DK 63 - a new section from the "Łomża Południe" junction to connect to the existing national road 63 in the area of ​​Podgórze;

- GP class,

- length - 8.9 km,

- bituminous surface,

- traffic category - KR4, surface load - 115 kN / axis,

- railway viaduct over the railway line no. 49 from Śniadowo to Łomża.

 

Client: GDDKiA

Value of the contract: PLN 218 100 000