S3 Expressroad Jawor - Bolków
Country: Poland, Jawor
Project value: 61047153.49
Type: Roads and Bridges
Project status: Concluded
Description
The project includes construction of expressroad from the junction Jawor II (without junction) to the junction Bolkow (with junction) with a length of approx. 16.105 km.
Within the project will be realized:
- construction of two interchanges "Jawor South", "Bolkow"
- construction of drainage system of the expressway and reconstructed road sections and construction of access roads and internal roads
- construction of four bridges within the expressway S3
- construction of road culverts,
- construction a fence of the expressway.
Technical parameters of the road:
- Cross-section of dual carriageway - 2 × 2
- technical class - S
- Vp design speed - 100 km / h
- number of traffic lanes - 2 x 2 x 3.5 m
- lane divider with bands - min. 5 m
- band width - 0.5 m
- emergency lane - 2.5 m
- width of roadside - 0.75 m
- traffic category - KR 7
- load surface - 115 kN / os
- gauge vertical - 4.7 m
- lateral inclination - 2.5%
Customer:
GDDKiA Wrocław
Contract Value:
262 502 760 / 61 047 153.49 EUR
1 EUR = 4.30
Year:
10/2015 – 12/2018