pl en
12 664 80 00

S17 Expressroad Skrudki - Sielce

Country: Poland, Kurów Project value: 64285714.29 Type: Roads and Bridges Project status: Concluded
Description

The project involves the construction of an expressway on the section "junction Skrudki" (without junction) - junction "Sielce" now "Kurów Zachód" (without junction) with engineering structures and associated infrastructure. Constructed section of the road will have 13.17 km. 

Section of the road will run parallel to the existing national road No. 17 in the south - west side.

 

Technical parameters of the expressway:

  • Cross section of dual carriageway, ie. 2 x 2
  • Technical Class S (expressway)
  • The design speed VP100 km / h
  • The number of lanes 2 x 2 x 3.5 m (solution stage)
  • Lane width 3.5 m
  • Reserve width of 12.0 m (with armbands - the solution stage)
  • The band width of 0.5 m (within the lane dividing)
  • Emergency lane width 2.50 m
  • Roadside width 0.75 m of ground (or more if desired location, facilities and environmental road safety)
  • The width of the crown of the road for the section of the new course of 32.5 m
  • Category movement KR7
  • Carrying capacity surface of 115 kN / axle
  • Vertical Gauge 5.0 m
  • Crossfall 2.5%

 

Technical parameters of the expressway:

  • Cross section of dual carriageway, ie. 2 x 2
  • Technical Class S (expressway)
  • The design speed VP100 km / h
  • The number of lanes 2 x 2 x 3.5 m (solution stage)
  • Lane width 3.5 m
  • Reserve width of 12.0 m (with armbands - the solution stage)
  • The band width of 0.5 m (within the lane dividing)
  • Emergency lane width 2.50 m
  • Roadside width 0.75 m of ground (or more if desired location, facilities and environmental road safety)
  • The width of the crown of the road for the section of the new course of 32.5 m
  • Category movement KR7
  • Carrying capacity surface of 115 kN / axle
  • Vertical Gauge 5.0 m
  • Crossfall 2.5%

 

Customer:

GDDKiA Lublin

Contract Value:

270 000 000 / 64 285 714.29 EUR
1 EUR = 4.20