Reconstruction of the National Road No 7 in the section Zabornia – Chyżne
Reconstruction of the national road, 34.6 km long section
The works were divided into four sections, in accordance with the designs prepared by particular design offices.
Section I:
Reconstruction of the national road No. 7, section between km 729+116 and km 735+100.
Section II:
Reconstruction of the national road No. 7, section between km 735+100 and km 741+356.35.
Section III
Reconstruction of the national road No. 7, section between km 741+356.35 and km 751+162.
Section IV
Reconstruction of the national road No. 7, section between km 751+162 and km 763+728.
The subject of the Contract is the reconstruction of the national road No. 7, section Zabornia-Chyżne, km 729+116 – 763+728.
Basic parameters
- Geosynthetic separating layer 128 000 m2
- 25 cm thick frost-proof layer made of natural aggregate 66 500 m3
- 35 cm thick layer of an additional base made of broken aggregate 82 000 m3
- 16 cm thick layer made of MCE blend 24 600 m3
- Levelling layer made of BA 0/16; 0/20 mm 35 500 ton
- Base made of BA 0/25 mm 81 500 ton
- Binding layer made of BA 0/20 mm, 6; 8 and 10 cm thick layers 46 000 ton
- 4 cm thick grinding layer made of SMA 41 400 ton
- Carbon-glass geo-net – reinforcement of the surface 137 000 m2
- Structural concrete 4 200 m3
- Reinforcing steel 220 ton
Customer:
GDDKiA Krakow
Contract Value:
174 392 020 PLN / 45 414 588.54 EUR
1 EUR = 3.84
Year:
08/2007 – 11/2009