Country: Poland, Balice Opatkowice Project value: 29574684.43 Type: Roads and Bridges Project status: Concluded
Description

Contract works include the reconstruction of the road and adjusting the surface of the highway A4 for the load capacity of 115kN/axis between Balice and Opatkowice, in the section: the left lane – km 411 + 346 – 426 +908,56, and the right lane – km 411 + 346 – 427 + 458,86, and five motorway junctions.

 

The range of works includes:

  • Milling and dismantling the existing road surface, together with elements of the road equipment; next, the reinforcement and construction of a new surface, and completing and profiling of the existing roadsides and the central reservation,
  • Rebuilding two bridges – replacing bridge superstructures and adjusting the bearings, and the renovation of 13 bridges, including 8 bridges which are a part of the highway and 5 bridges over the highway,
  • Renovation, replacement and supplementing the elements of the drainage system of the right of way,
  • Renovation and reconstruction of the lighting and the power supply,
  • Construction of the pedestrian/cycling bridge, with the necessary equipment and accesses,
  • Construction of the floodgate control room in the „Kościuszko” barrage,
  • Reconstruction of the horizontal road marking, renovating and supplementing the vertical road marking, variable message signs and the monitoring station with its power supply,
  • Replacement of crash barriers and construction of the railing of the road,
  • Renovation of farm roads and construction of technical exits.

 

Basic parameters:

  • Base made of aggregate stabilized mechanically - 8.355  m3
  • WMS bituminous base - 11.341  m3
  • WMS 0/20 binding layer, 9 cm thick - 380.002  m2
  • Grinding layer made of SMA 3,6 cm blend - 369.567  m2
  • Surface made of material obtained from dismantling the existing road - 12.364  m3
  • Fiberglass mesh for the surface protection - 250 627  m2
  • Energy absorbing barriers - 42.386  mb
  • Railing of the highway - 31.087  mb

 

Customer:

GDDKiA Warszawa

Contract Value:

108 243 345 PLN / 29 574 684.43 EUR
1 EUR = 3.66

Year:

10/2006 – 12/2008