pl en
12 664 80 00

Extension of 1 Maja Street with construction of Herbski bridge

Country: Poland, Kielce Project value: 2726172.84 Type: Roads and Bridges Project status: Concluded
Description

The Contract includes reconstruction of a viaduct at ul. 1-go Maja in Kielce, colloquially called “Herbski Bridge”. The investment concerns also the expansion of the streets adjacent to the structure and, as a result, reconstruction of the medium voltage and low voltage power network, operating system, telecommunication network, gas network, sewer systems and water supply system.

 

The constructed viaduct is a one-span structure of ferroconcrete monolithic slab structure, of still reinforcement made of rolled profile of HE650M type, supplemented with placid reinforcement made of BSt500 steel.

  • supported span L = 27 m
  • taper = 46,5
  • width (perpendicular to the axis of the carriageway) B = 14 m which includes:
  • carriageway: 2 x 3,5 = 7 m
  • sidewalks at both sides: 2,25 m
  • thickness of the span: h = 0,8 m;
  • load class: class A – 50 t
  • elastomeric bearings - 14 pieces, also for negative reactions, 2 pieces
  • foundation on ferroconcrete piles, pref. 40/40 cm, length: 10,0 m.
  • slab on grade - 1,0m thick
  • ferroconcrete ribbed headwalls,
  • ferroconcrete top plate with plinths, back curtain wall which encloses the structure from the side of embankment as well as constitutes a support for ferroconcrete monolithic transition plates.

 

Customer:

MZD Poland

Contract Value:

11 041 000 PLN / 2 726 172.84 EUR
1 EUR = 4.05

Year:

08/2009 – 08/2010