pl en
12 664 80 00

Expressroad S5 Radomicko– Leszno Południe

Country: Poland, Poznań Project value: 103023255.81 Type: Roads and Bridges Project status: Concluded
Description

The contract includes the construction of expressroad S5 with a length of more than 19 kilometers between Poznan and Wroclaw.

 

The scope of works includes:

  • construction of a 19 km two-lane expressway;
  • construction of two interchanges;
  • construction of Rest and Service Areaa;
  • reconstruction of fragments of the existing public roads, construction of access and service roads that serve as access roads to the property and for support of areas adjacent to the road);
  • construction of engineering structures within the expressway and over the expressway within the cross-roads;
  • reconstruction and the removal of collisions with technical infrastructure not connected with the road, including: power, gas, telecommunications, telecommunication, dehydration devices, road lighting;
  • execution and introduction of permanent and temporary traffic organization on expressway and sections of reconstructed roads;
  • construction of environmental protection equipment: animal crossings and other environmental protection equipment, acoustic screens, greenery, fences;
  • development of documentation of construction;
  • obtaining a decisions on the permit to use.

 

Customer:

GDDKiA

Contract Value:

443 000 000 / 103 023 255.81 EUR
1 EUR = 4.30