pl en
12 664 80 00

Designing and construction of bridge II over the Vistula River in Sandomierz along with junction to the existing national road No. 77, that is, ul. Lwowską in Sandomierz

Country: Poland, Sandomierz Project value: 15848980.29 Type: Roads and Bridges Project status: Concluded
Description

The undertaking aims at construction of a new bridge over the Vistula river along the national road No. 77 The structure is in the vicinity of the existing bridge, so its erection shall allow to execute the second carriageway of ul. Lwowska-bis (DK 77). For aesthetic reasons, the size parameters of the designed bridge have been adjusted to the size of the existing structure. The designed structure is a five-span bridge of static continuous diagram and theoretical span 84,8+3x95,4+84,8. The length of the structure is 458,00 m, and the width is 14,1 m, total area of the bridge between the expansion joints is 6457,8 m2. Each of the intermediate supports shall be founded on 16 RCC bored piles, length - 25 m and diameter 1,5 m, while under the abutments, the number of piles was increased to 17. The loadbearing structure shall be a box, single-chamber girder made from prestressed concrete in the technology of support concreting along with the deck (overlap method). The investment project includes also road works in the section of 0,94 km, which involve joining the newly-built structure with the existing communication arrangement. The Vistula banks shall be strengthened and utilities shall be reconstructed. The investment project is executed in the “design and build” system.

 

Basic parameters:

  • Steel - 1113 tons
  • Concrete - 15271 m3
  • Presetressing steel - 250 tons
  • Earthworks - 41250 m3
  • SMA wearing course - 3800 m2

 

Customer:

General Directorate for National Roads and Motorways, Department in Kielce

Contract Value:

65 931 758 PLN / 15 848 980.29 EUR
1 EUR = 4.16

Year:

11/2008 – 01/2011