Continuation of works connected with the construction of new two-level intersections within the area of the Ciechanów Local Control Centre

Country: Poland, Ciechanów Project value: 15616615.12 Type: Roads and Bridges Project status: Concluded
Description

Scope of the investment:

Overbrigde in km 94,006 together with a parallel road from km 92,715 to km 93,973

Scope of the investment:

  • Construction of an overbridge in km 94,006 along the E-65 railway line Warsaw-Gdynia
  • Reconstruction of a section of national road no. 50 (ul. Kasprzaka)
  • Construction of a section of the road parallel to the tracks, from km 92,715 to km 93,973 of the E-65 railway line Warsaw-Gdynia
  • Construction of the road system on both sides of the railway line connecting the existent infrastructure with the designed overbridge
  • Construction of the drainage system for the overpass and the road system
  • Construction of the stormwater draining system along the railway line with water evacuation to rivers
  • Reconstruction and expansion of the existent network of underground utilities within the scope necessary in order to remove clashes with the designed infrastructure
  • Construction of pedestrian paths together with the construction of staircases adapted for the disabled within the area of the overbridge
  • Execution of technical devices (fencing) related to the facility
  • Dismantling the level crossing in km 92,715 and 94,006 of the E-65 railway line Warsaw-Gdynia together with the infrastructure connected with the liquidated crossing
  • Dismantling of the residential building on plot no. 286, section 90: Niechodzin-Bielin
  • Dismantling of the level crossing gatehouse in km 94,003 on record parcel no. 292, section 60: Krubin

 

Overbrigde in km 95,429

Scope of the investment:

  • Construction of an overbridge in km 95,419 together with retaining walls
  • Construction of a road system connected with the overbridge and local roads, interconnecting access roads to buildings
  • Construction of pedestrian paths together with the construction of staircases and lifts adapted for the disabled
  • Construction of the drainage system for the engineering facilities and roads
  • Removal of telecom, power, gas, water and railway traffic control obstacles 
  • Reconstruction and expansion of the existent network of underground utilities within the scope necessary in order to remove clashes with the designed infrastructure
  • Dismantling the level crossing in km 95,419
  • Dismantling of road infrastructure functionally connected with the level crossing to be dismantled

 

Overbrigde in km 108,445

Scope of the investment:

  • Construction of an overbridge along a local road, in km 108,445 of the E-65 railway line
  • Construction and reconstruction of the road system connected functionally with the overbridge constructed
  • Reconstruction and expansion of the existent network of underground utilities within the scope necessary in order to remove clashes with the designed technical infrastructure
  • Dismantling of the existing level crossing in km 108,441 of the E-65 railway line, together with the accompanying technical infrastructure

 

Rail-over-road bridge in km 109,984 – stage II

Scope of the investment:

  • Construction of a rail-over-road bridge in km 109,984 of the E-65 railway line – stage II
  • Construction of a system of access roads to the engineering facility
  • Reconstruction of passenger platforms at the Krośnice Mazowieckie passenger station together with structural landscaping – stage II
  • Reconstruction of the drainage for: the track system, the engineering facility and the access roads together with a pumping station – stage II
  • Reconstruction of the non-traction power installation
  • Construction of lighting for the road system and the Krośnice Mazowieckie passenger station
  • Reconstruction and expansion of the existent network of underground utilities within the scope necessary in order to remove clashes with the designed infrastructure
  • Dismantling of the existing level crossing in km 110,025 with the accompanying infrastructure

 

Customer:

PKP Polskie Linie Kolejowe S.A.

Contract Value:

64 028 122 / 15 616 615.12 EUR
1 EUR = 4.10

Year:

11/2013 – 11/2014