Construction of two viaducts along National Road No 17 Lublin - Zamość
The Investment aimed for the construction of 3 viaducts within the scope of works of the contract for “Construction of Piaski By-pass along national road (expressway) no S17 and national road (expressway) no S82”.
Viaduct in Mełgiew Interchange.
2-span structure made of reinforced concrete. Beam and slab load-carrying structure 2 x 21.00 m long (measured on the slant). Two reinforced concrete girders 1.15 m high and connected by platform slab were made in cross section. Viaduct was founded on the large diameter piles ø 150 cm made of reinforced concrete.
Viaduct in„Chełm I” i „Chełm II” Interchange
Load-carrying structure was made as monolith continuous beam in wet technology supported by bearings on pillars. Full-wall abutments, column pillars. Pillars founded by continuous footings on large diameter piles ø 100 cm.
Basic parameters
- Total length of structure in axis of pillars 42.00 m
- Total width of load-carrying structure 15.20 m
- Total length of structures 2 x 106.84 m
- Total width of each viaduct 12.20 m
- Carriageway width of each viaduct 10.60 m
- Amount of used concrete – for all 3 structures 2,726.00 m3
- Amount of reinforced steel – for all 3 structures 347,703.00 kg
Customer:
STRABAG Sp. z o.o
Contract Value:
7 452 286.81 PLN