pl en
12 664 80 00

Construction of the S17 Expressway, Kurów (Sielce interchange, junction with S12) – Bogucin interchange

Country: Poland, Lublin Project value: 52450000 Type: Roads and Bridges Project status: Concluded
Description

Engineering structures:

20 engineering structures shall be built, including 7 bridges, 13 road viaducts, 29 animal and reptile crossings (both independent and integrated with the engineering structures or culverts) and culverts.

 

Interchanges:

  • Sielce
  • Kurów
  • Przybysławice
  • Bogucin

Rest areas:

  • Markuszów Północ: ultimately: petrol station, vehicle service stations, convenience stores and restaurants and accommodation facilities - by the carriageway  (direction Warsaw).
  • Markuszów Południe: parking places for passenger cars and trucks, benches and tables, sanitary devices; rest area II: petrol station, vehicle service stations, convenience stores and restaurants - by the carriageway  (direction: Lublin).

 

Environment protection

Construction of noise barriers (total length: approximately 10,2 km), crossings for big animals (3 items), medium-sized animals (4 items), small animals (15 items) and reptiles (7 items) as well as a tight drainage system and soft landscaping (trees and bushes).

 

Basic parameters

  • road class  S 2/2 (ultimately: S 2/3)
  • design speed - 100 km/h
  • operating speed – 110 km/h
  • traffic lane width - 3,50 m
  • width of the hard shoulder for emergency stop - 2,50 m
  • basic width of the median strip with rumble strips – 12,00 m
  • basic width of the soft shoulder - 0,75 m.

load-115 kN/axis

 

Customer:

GDDKiA Lublin

Contract Value:

157 350 000 PLN / 52 450 000.00 EUR
1 EUR = 3.00

Year:

07/2012 – 05/2013