Construction of the S17 Expressway, Kurów (Sielce interchange, junction with S12) – Bogucin interchange
Country: Poland, Lublin
Project value: 52450000
Type: Roads and Bridges
Project status: Concluded
Description
Engineering structures:
20 engineering structures shall be built, including 7 bridges, 13 road viaducts, 29 animal and reptile crossings (both independent and integrated with the engineering structures or culverts) and culverts.
Interchanges:
- Sielce
- Kurów
- Przybysławice
- Bogucin
Rest areas:
- Markuszów Północ: ultimately: petrol station, vehicle service stations, convenience stores and restaurants and accommodation facilities - by the carriageway (direction Warsaw).
- Markuszów Południe: parking places for passenger cars and trucks, benches and tables, sanitary devices; rest area II: petrol station, vehicle service stations, convenience stores and restaurants - by the carriageway (direction: Lublin).
Environment protection
Construction of noise barriers (total length: approximately 10,2 km), crossings for big animals (3 items), medium-sized animals (4 items), small animals (15 items) and reptiles (7 items) as well as a tight drainage system and soft landscaping (trees and bushes).
Basic parameters
- road class S 2/2 (ultimately: S 2/3)
- design speed - 100 km/h
- operating speed – 110 km/h
- traffic lane width - 3,50 m
- width of the hard shoulder for emergency stop - 2,50 m
- basic width of the median strip with rumble strips – 12,00 m
- basic width of the soft shoulder - 0,75 m.
load-115 kN/axis
Customer:
GDDKiA Lublin
Contract Value:
157 350 000 PLN / 52 450 000.00 EUR
1 EUR = 3.00
Year:
07/2012 – 05/2013