pl en
12 664 80 00

Construction of the road viaduct with ramps in Stalowa Wola

Country: Poland, Stalowa Wola Project value: 2998728.09 Type: Roads and Bridges Project status: Concluded
Description

The object is a 7-span road viaduct with span lengths of 17,0 +23,0 + 35,0 + 45,0 + 23,0 + 17,0 = 195,0m. The total length of the object including wings is 207,05 m (measured along the axis of  formation line). Major part of the viaduct is situated in the straight line, the skew angle with the existing road below is 75,6º. Only two final spans on the side of Graniczna St. and 10-meter long part on the side of Polna St. are designed along horizontal arches, with radiuses of – 250 and 400 m. The longitudinal alignment of the Viaduct forms a vertical arch of  R = 1500,0 m.


Basic parameters

  • Load „B” wg PN-85/S-10030
  • Theoretical length 195,0m
  • Total length including wings  207,05m
  • Construction width 13,38m
  • Road width (2x4,0m) 8,0m
  • Safety line width (2x0,50m) 1,0 m
  • Barrier SP-06 (2x0,36m) 0,72m

 

 

Customer:

GDDKIA in Rzeszów

Contract Value:

11 635 065 PLN / 2 998 728.09 EUR
1 EUR = 3.88

Year:

01/2006 – 12/2006