Construction of the Chodel Bypass
Road works
1. Execution of demolition works (buildings, pavement structures, sidewalks, culverts, fencings etc.) together with the utilization of redundant materials from disassembly
2. Construction of bypass (length: 5.23km)
3. Construction of channelized junctions
4. Construction of service roads and streets
5. Reconstruction of intersecting roads
6. Construction of sidewalks and a bicycle path
7. Construction of culverts
8. Construction of a holding tank with fencing
9. Soil stabilisation through nailing
10. Dynamic soil replacement
Bridge works
The scope of bridge works encompasses the construction of facilities together with a load test of the WD-1 road overpass along the DW-747 regional road
1. MD-2 overbridge along the DW-747 regional road
2. PP-3 footbridge under the DW-747 regional road
3. WD-4 overbridge along the DW-747 regional road
Subcontracted works
1. Power engineering: low voltage and medium voltage
2. Street lighting
3. Telecom engineering
4. Water main
5. Stormwater drainage
6. Sewerage system
7. Gas – medium pressure and high pressure
8. Noise screens
9. Environmental supervision
10. Archaeological supervision and rescue excavations (if needed)
11. Winter maintenance 2013/2014
Customer:
Regional Road Authority in Lublin
Contract Value:
62,582,546 / 15 264 035.61 EUR
1 EUR = 4.10
Year:
01/2014 – 12/2014