pl en
12 664 80 00

Tomaszow Lubelski bypass opened to traffic

29-11-2021
Tomaszow Lubelski bypass opened to traffic

Drivers may already use the Tomaszów Lubelski Bypass. Today, we have opened to traffic the road completed within the scope of the basic contract: almost 10 km of the route along with a 300-metre flyover and two interchanges: Tomaszów Pn. and Tomaszów Pd. Currently, in accordance with the contract, we are continuing works on the bypass, building the second line.


About the investment
The contract we are executing includes the construction of a Tomaszów Lubelski bypass with expressway parameters. The route runs on the eastern side of the town. The W1 "Tomaszów Lubelski Północ" junction was built at the intersection with the provincial road No. 850, and the W2 "Tomaszów Lubelski Południe" junction was built at the junction joining the DK17 route. The bypass was originally planned as a single-lane road, and only in the area of both junctions a dual-lane road. As a result of a supplementary order placed in September 2020, the Tomaszów Lubelski bypass will also gain a second carriageway on the 5.4 km section between Junctions W1 and W2. Over the valley of the Sołokija river the road will eventually run on two twin flyovers, each 304 m long. Access roads were also built to serve the local traffic.