Country: Poland, Zabornia – Chyżne Project value: 45414588.54 Type: Roads and Bridges Project status: Concluded
Description

Reconstruction of the national road, 34.6 km long section
The works were divided into four sections, in accordance with the designs prepared by particular design offices.


Section I:
Reconstruction of the national road No. 7, section between km 729+116 and km 735+100.


Section II:
Reconstruction of the national road No. 7, section between km 735+100 and km 741+356.35.


Section III
Reconstruction of the national road No. 7, section between km 741+356.35 and km 751+162.


Section IV
Reconstruction of the national road No. 7, section between km 751+162 and km 763+728.


The subject of the Contract is the reconstruction of the national road No. 7, section Zabornia-Chyżne, km 729+116 – 763+728.

 

Basic parameters

  • Geosynthetic separating layer 128 000 m2
  • 25 cm thick frost-proof layer made of natural aggregate 66 500 m3
  • 35 cm thick layer of an additional base made of broken aggregate 82 000 m3
  • 16 cm thick layer made of MCE blend  24 600 m3
  • Levelling layer made of BA 0/16; 0/20 mm 35 500  ton
  • Base made of BA 0/25 mm 81 500   ton
  • Binding layer made of BA 0/20 mm, 6; 8 and 10 cm thick layers 46 000 ton
  • 4 cm thick grinding layer made of SMA 41 400  ton
  • Carbon-glass geo-net – reinforcement of the surface 137 000 m2
  • Structural concrete 4 200 m3
  • Reinforcing steel 220 ton

 

Customer:

GDDKiA Krakow

Contract Value:

174 392 020 PLN / 45 414 588.54 EUR
1 EUR = 3.84

Year:

08/2007 – 11/2009