Fajny Dom phases I-III
Housing and service complex with an office building, underground garages and parking lots, along with the incorporation of the designed circulation path – stage I, phase 1-3, buildings: G, B, D, F, C, E.
The complex is composed of buildings of different heights; five-storey detached buildings, six-storey typical buildings and, partially, seven-storey corner buildings on the north.
Individual buildings designed as simple repeatable structures. Buildings designed in the RCC technology, with column and slab load-carrying structure and walls made of medium-sized hollow blocks. The entire structure is braced with RCC staircase walls. External walls covered with cream-coloured system plaster coating with contrasting graphite fragments (floor slab strips, bay window sill walls).
Basic parameters
DATA CONCERNING THE PLANNED BUILDINGS
Number of underground floors | 1 |
Number of overground floors | 6-7 |
Floorage | 51242,7m² |
Floorage - general circulation path | 4081,2m² |
Floorage - garages | 12815,1m² |
Floorage - flats | 33588,55m² |
Number of flats | 578 |
Number of parking lots in the garage | 211 + 118 outside |
Opening date (phase 1) – July 31st 2007
Closing date (phase 3) – September 10th 2012
Customer:
Sołtysowska Project Development Sp. z o.o.
Contract Value:
125 192 000 / 29 807 619.05 EUR
1 EUR = 4.20
Year:
07/2007 – 09/2012