Electrical Substation Sochaczew

Country: Polska Project value: 0 Project status: In progress
Description

The expansion of the station includes a number of activities related to the

construction of new elements and the modernization of existing ones.

The contract includes:

• wexecution of detailed and as-built documentation for the

Project, along with conducting public communication activities,

• expansion of the 220 kV switching station and construction of

the 220/110 kV transformation,

• modernization of the existing stormwater drainage network to

increase capacity, including replacement of the oil separator,

• modernization of the system of internal roads to the possibility of

building access benches to the newly constructed station,

• construction of 400 kV fields and connection to 400 kV line

Chelm-Lublin Systemowa,

• construction of a relay building and a building for own needs,

• construction of a new AT1 autotransformer stand,

• construction of a 110 kV cable line to connect the existing

autotransformer unit AT2 with field No. 2 of the 110 kV switchgear,

• delivery, installation and commissioning of SOT systems, as well

as telecommunications work.