Construction of the S8 Expressway Wrocław - Psie Pole – Syców; stage I
The investment includes the designed course of S8 Expressway, in accordance with the issued decisions on the location of the road. The building design includes the execution of the section of S8 road, of the length of 22 095.43m and connector to the regional road no. 340 of the length of 3 888.81m along with reconstruction of sections of poviat and local roads, as well as construction of access roads. The design includes also construction of bridge objects and drainage elements for S-8 road, connector and other roads (sewage, inlets, ducts, culverts, tanks). The project includes also the construction and reconstruction of all necessary infrastructural devices necessary for the execution of the investment as well as includes elements and devices for traffic safety.
1) Maneouvre carriageways at service areas | 550 090 m2 |
2) Carriageway of the road no. 340 | 50 387 m |
3) Bridges and viaducts | 10 420 m2 |
4) Shoulders | 125 087 m2 |
5) Median strip | 93 879 m2 |
6) Making good the area | 1 308 734 m2 |
7) Poviat and regional roads | 40 646 m2 |
8) Access roads | 176 862 m2 |
9) Embankment and excavation slopes | 588 563 m2 |
10) Parking places at service areas | 12 649 m2 |
IN TOTAL: | 2 957 317 m2 |
Customer:
GDDKiA Wrocław
Contract Value:
367 875 211 PLN / 91 511 246.52 EUR
1 EUR = 4.02
Year:
12/2010 – 06/2012