Construction of the Northern Bypass of the City of Pszczyna – the Area of the Designed Interchange of the National Road No. 1 with the Regional Road No. 935.

Country: Poland, Pszczyna Project value: 13000000 Type: Roads and Bridges Project status: Concluded
Description

The works shall include the construction of the northern bypass of the city of Pszczyna in the part concerning the construction of the interchange connecting the National Road No. 1 with the designed Regional Road No. 935, which is to serve as a new route up to the boundary with the Suszec commune.

 

Basic Parameters /Podstawowe Parametry

  • G-class road 1x2, KR6, bridge over a GP-class road, 2 X 2
  • Length of the section subject to the re construction within the area of DK-1: 1,001.84 [linear meters]
  • Total length of the connectors that comprise the interchange: +- 2.1 [km]
  • Earthworks – volume: 38 thousand [m3]
  • Embankments – volume: 31.5 thousand [m3]
  • Leveling, compacting and stabilization of the soil with geosynthetics – 45.5 thousand [m2]
  • Compacted crushed-stone aggregate 0/63 mm roadbase: 38 thousand [m2]
  • Compacted crushed-stone aggregate 0/31.5 mm roadbase: 38 thousand [m2]
  • Asphalt concrete AC22P roadbase: 33 thousand [m2]
  • Asphalt concrete AC22W 22 binding course: 2.5 thousand [m2]
  • SMA AC22S wearing course: 31.7 thousand [m2]
  • Slope stabilization with geogrids, geofibers and geosynthetics 100 Kn/m – 12.5 thousand [m2]
  • Execution of CMC columns – 865 linear meters
  • Soil reinforcement with geosynthetics 7500 Kn/m
  • Theoretical span Lt = 178.63 m
  • Total span L=179.24 m
  • Main gantry, width: 18.76 m
  • Load-carrying structure made of a metal studs framing sharing load with the reinforced concrete slab
  • Vertical curve R=3000m
  • Load class A 

 

Customer:

Zarząd Dróg Wojewódzkich W Katowicach

Contract Value:

52 000 000 PLN / 13 000 000.00 EUR
1 EUR = 4.00