Construction of a Viaduct over the PKP Railway in Krzeszowice
Under the investment, the Company built a new road-over-rail along with a section of the National Road No. 79 and local roads. Apart from the two slipways which were constructed from the side of Kraków, an intersection with DK79 shall be built within the area of ul. Zimna Woda. Due to the investment, the Company had to demolish 19 building structures, including 7 residential buildings. After the completion of the new road-over-rail, the existent facility shall be disassembled along with the access roads. Apart from the excluding of the old facility (which poses the threat of a disaster) from occupancy, the investment aimed at improving transport system in the area. Additionally, the new facility is adjusted to the rigorous requirements of the E30 high-speed railway line Ząbkowice - Kraków (the Main Line).
Parameters
- Theoretical span of the road-over-rail: 34.00+56.00+34.00+32.00=156.00 m,
- Total width: 2.84+0.50+2 X 3.50+0.50+2.84 =13.68 m,
- Piled foundation – large-diameter piles (Fi1500) with the base expended up to Fi2500 – length: 12m
- Load-carrying structure: a two-beam, prestressed, four-span structure
Customer:
GDDKiA Kraków
Contract Value:
25 000 000 PLN / 6 250 000.00 EUR
1 EUR = 4.00
Year:
03/2010 – 09/2011