Construction of A-4 Motorway, Nogawczyce - Kleszczów
Construction of the 6,9 km long motorway section Nogawczyce – Kleszczów including two-level “Kleszczów” road interchange. The construction comprised road works, service roads and forest roads.The scope of works contains preparatory works, earthworks; excavations, embankments and soil replacement), construction of storm drainage system, base courses, pavement, slopes and ditch strengthening and greenery works, assembling of safety steel barriers with reflecting elements, acoustic screens, 3 one-span structures along motorway route over side road (33.72 m, 30.60 m and 31.00 m long), 2 two-span structures along motorway route over railway track (56.00 m and 75.56 m long), 2 frame culverts 53.85 m and 62.75 m long for stream under motorway route (soil under culverts reinforced by “jet grounding” injection method), forestry game passage over motorway route (2-spam structure 46.60 m long), construction of existing viaduct (from thirties of 20th century) over motorway route 57.52 m long in Kleszczów and object within Kleszczów Interchange (exit and access road to the motorway, 2-spam bridge, 2 fare gates).
Basic parameters
- Storm sewage system 5 270,35 m3
- Base course made of aggregate stabilized mechanically 83 882,93 m3
- Base course made of asphaltic concrete 31 283,40 m3
- Frost resistance course made of broken aggregate from demolition works 12 424,10 m3
- Frost resistance course made of new material 52 783,52 m3
- Binding course made of asphaltic concrete 0/20 8 cm thick 177 029,10 m2
- Protective course made of hard-cast asphalt 5 814,92 m2
- Steel safety barriers 14 913,44 mb
- Acoustic screens 2.00 – 3.5 m high 3 067,70 mb
Customer:
Mota&Companhia S.A.
Contract Value:
97 192 712 PLN / 22 550 513.23 EUR
1 EUR = 4.31
Year:
04/2002 – 12/2004