Projects
Construction of the Eastern Bypass Road for the City of Przemyśl, joining the National Road No. 77 and the National Road No. 28
Location: Poland, Przemyśl
Description:
Scope of road and bridge works
Construction of a two-carriageway bypass; length: 3,84 km
Reconstruction of 12 sections of city streets of the total length of 4,485 km
Reconstruction of 6 junctions
Construction of the main bridge on the San River: (MG) – 230 m x 22 m, suspended on a pylon of the height of 60,77 m
Construction of the main gantry (EG) – 73 x 22 m (extension of the MG bridge)
Construction of the WD-1 viaduct - 106 x 12,6 m
Construction of the viaduct WD-2 - 226 x 2x17,4 m (extension of the EG)
Reconstruction – extension of the 2 existing culverts under the bypass (PD-1, PD-2) - RCC pipes ø 125
Construction of 2 new culverts under the bypass (PD-3, PD-4)
Construction of the underbridge under the bypass (P-1)
Construction of 2 underground pedestrian and bicycle crossings (TP-1A, TP-1B) under the bypass designed
Construction of 2 pedestrian and bicycle crossings (TP-2) under the railway (in the railway embankment) - jacking method
Protection of both San banks within the area of the bridge
Scope of rerouting of utilities and infrastructure:
Construction and reconstruction of MV and LV power lines
Construction of water-pipe networks
Construction of road lighting and power supply
Construction of storm water drainage
Construction and reconstruction of the telecom and IT network
Construction of light signalling
Reconstruction of overhead railway line equipment
Customer:
Zarząd Dróg Miejskich in Przemyśl (Urban Road Management in Przemyśl)
Contract Value:
220,9 mln PLN / 552.25 EUR
1 EUR = 4.00
Position:
Latitude: 49.808856°N
Longitude: 22.770452°E