BACK 

Projects

Construction of the Eastern Bypass Road for the City of Przemyśl, joining the National Road No. 77 and the National Road No. 28

Location: Poland, Przemyśl

Description:

Scope of road and bridge works

Construction of a two-carriageway bypass; length: 3,84 km

Reconstruction of 12 sections of city streets of the total length of  4,485 km

Reconstruction of 6 junctions

Construction of the main bridge on the San River:  (MG) – 230 m x 22 m, suspended on a pylon of the height of 60,77 m

Construction of the main gantry (EG) – 73 x 22 m (extension of the MG bridge)

Construction of the WD-1 viaduct - 106 x 12,6 m

Construction of the viaduct WD-2 - 226 x 2x17,4 m (extension of the EG)

Reconstruction – extension of the 2 existing culverts under the bypass (PD-1, PD-2) - RCC pipes ø 125

Construction of 2 new culverts under the bypass (PD-3, PD-4)

Construction of the underbridge under the bypass (P-1) 

Construction of 2 underground pedestrian and bicycle crossings (TP-1A, TP-1B) under the bypass designed

 Construction of 2 pedestrian and bicycle crossings (TP-2) under the railway (in the railway embankment) - jacking method

Protection of both San banks within the area of the bridge

Scope of rerouting of utilities and infrastructure:

Construction and reconstruction of MV and LV power lines

Construction of water-pipe networks

Construction of road lighting and power supply

Construction of storm water drainage

Construction and reconstruction of  the telecom and IT network

Construction of light signalling

Reconstruction of overhead railway line equipment

Customer:

Zarząd Dróg Miejskich in Przemyśl (Urban Road Management in Przemyśl)

Contract Value:

220,9 mln PLN / 552.25 EUR
1 EUR = 4.00

Position:

Latitude: 49.808856°N
Longitude: 22.770452°E