You are here:
Projects
Achat Hotel – Budapest

Construction of three stars hotel with 135 rooms. This work include the interior and exterior works, as well as parking under the hotel. Basic parameters: Construction area: 2 205 m2 Built-up area in gross: 6 383 m2
READ MOREAndor – Tétényi condominium Project

This work include a construction of two buildings, structure construction and the plaster works. The buildings are located in the Andor-Tétényi residential building. Basic parameters: Construction area: 5 340 m2 Built-up area: 13 627 m2 Number of flats: 164
READ MORE47 road construction

47 no. Road Algyő - Hódmezővásárhely section includes the enlargement of the four bands of 202 +450 - 207 +000 km no. between length of 4.550 km.
READ MORELake View
Craiova Mall
Overpass Pipera Tunari
Doamna Ghica Plaza
Kunmadaras Ex-soviet Airport Damage re-cultivation

Contaminated soil and ground-water damage elimination in the territory of Kunmadaras ex-Soviet airport, according to the “Technical Intervention Scheme”, observing the regulations of the competent environmental protection authority.
READ MOREConstruction of Express Road S-3 part from interchange Międzyrzecz Południe” to the interchange of „Sulechów”

The scope of the investment includes: construction of a section of the Expressway, of the length of 16,19 km, of cross-section, 2x2 traffic lanes and technical parameters of S-class road, construction of new sections of the existing National Road no. 3 in the region of clash with the designed \ expressway, of cross-section, 1x2 traffic lanes and technical parameters of a road of GP class. reconstruction of the junction with grade separation, „Międzyrzecz Południe," of PI-type connectors, reconstruction of the existing diagonal poviat, local and agricultural roads which...
READ MOREConstruction of the S-8 Expressway Wrocław - Psie Pole – Syców; stage I

The investment includes the designed course of S8 Expressway, in accordance with the issued decisions on the location of the road. The building design includes the execution of the section of S8 road, of the length of 22 095.43m and connector to the regional road no. 340 of the length of 3 888.81m along with reconstruction of sections of poviat and local roads, as well as construction of access roads. The design includes also construction of bridge objects and drainage elements for S-8 road, connector and other roads (sewage, inlets, ducts, culverts, tanks). The project includes also...
READ MOREThe designing and extension of the National Road No 8 to the parameters of an expressway at the section Jeżewo –...

A) Building permit design includes: - execution of a section of S8 road, of the length of about 24 515m (Km 614+850– Km 639+365), - execution of the connector to National Road no. 64 and Regional Road no. 671 along with reconstruction of the sections of district and local roads as well as construction of access roads, - construction of bridge structures and drainage elements for the S-8 road, connector and of the other roads (sewage, inlets, ducts, culverts, tanks), construction of the remaining elements of equipment as well as construction and reconstruction of all the necessary...
READ MOREConstruction of the S17 Expressway, Kurów (Sielce interchange, junction with S12) – Bogucin interchange

Engineering structures: 20 engineering structures shall be built, including 7 bridges, 13 road viaducts, 29 animal and reptile crossings (both independent and integrated with the engineering structures or culverts) and culverts. Interchanges: Sielce Kurów Przybysławice Bogucin Rest areas: Markuszów Północ: ultimately: petrol station, vehicle service stations, convenience stores and restaurants and accommodation facilities - by the carriageway (direction Warsaw). Markuszów Południe: parking places for passenger cars and trucks, benches and...
READ MOREComplex Development of Infrastructure in the Investment Area of the City of Przemyśl

Scope of road works: Construction of ul. Stawowa /Stawowa street/ – from the junction with ul. Bakończycka – km 0+0,00 to km 0+177,50 along with a junction and public road marked as KDD, construction of ul. Ułańska – section from the junction with ul. Słowackiego – km 1+421,06 to km 1+250,13, along with the junction with public road marked as KDW, Construction of ul. Pusta – from the junction with ul. Bakończycka to the public road marked as KDD – km 0+0,00 to km 0+190,68, Construction of public road marked as KDD to the public road marked as...
READ MOREConstruction of the Eastern Bypass Road for the City of Przemyśl, joining the National Road No. 77 and the National...

Scope of road and bridge works Construction of a two-carriageway bypass; length: 3,84 km Reconstruction of 12 sections of city streets of the total length of 4,485 km Reconstruction of 6 junctions Construction of the main bridge on the San River: (MG) – 230 m x 22 m, suspended on a pylon of the height of 60,77 m Construction of the main gantry (EG) – 73 x 22 m (extension of the MG bridge) Construction of the WD-1 viaduct - 106 x 12,6 m Construction of the viaduct WD-2 - 226 x 2x17,4 m (extension of the EG) Reconstruction – extension of the 2 existing culverts...
READ MOREConstruction of a Road Interchange in the Junction of ul: Żelazna, 1-go Maja and Zagnańska along with the...

The Investment shall be divided into three phases. Execution of the following works is planned for phase one: Reconstruction of the Gustaw Herling-Grudziński Roundabout into a 4-outlet turbo roundabout Construction of underground pedestrian crossings Reconstruction of ul. 1-go Maja into a 2-carriageway road. Phase 2 shall include the reconstruction of ul. Czarnowska into a single-carriageway local road of a parking character. The road shall be accessed only by public transport buses. In phase 3 of the investment, a two-carriageway ul. Żelazna shall be built, section: from the...
READ MOREUnderground Car Park Located under the Nowy Targ Square in Wrocław, along with the Necessary Infrastructure and...

Construction of the underground car park under the Nowy Targ Square is a part of the parking policy consisting in the reduction of wheel transport in the centre of Wrocław. The investment is executed under a license agreement concluded with the Municipality of Wrocław. The project includes guidelines and solutions of the winning entry in the competition for elaboration of an architectural concept for the development of the Square, prepared by dr arch. Roman Rutkowski. The underground car park was designed as an RCC monolithic structure, in a slab-column system. The...
READ MOREDobczyce Bypass

Work type: Construction of a G – class road; length 905 m, construction of a roundabout of the external diameter of 50 m and a channelized junction from the side of Dobczyce. Construction of engineering structures: a) Access gantry: - load class A, - static scheme - 16-span continuous beam, - span length – 21,5 + 14 x 30 +21,5 m = 465,5 m -...
READ MOREPolyfunctional apartment house lokalita Prague 5 – Hlubočepy, Barrandovská vyhlídka
Apartment house lokalita Prague 5 – Zličín “Metropole NOP”
Reconstruction of depository Kutná Hora - Hlouška






