BACK

You are here:



Projects

Filter by:

  • Concluded

    • All
    • In progress
    • Concluded
  • Type

    • ALL
    • Bridge
    • Building
    • Road
    • Other
  • Value in EUR

    • ALL
    • 1 mln - 50 mln
    • 50 mln – 125 mln
    • 125 mln – 250 mln
    • 250 mln – 500 mln
    • > 500 mln
  • Country

    • ALL
    • Czech Republic
    • Hungary
    • Poland
    • Romania
    • Slovakia

Family houses – Vackov, Prague 3

bridge

Construction of 25 family houses and infrastructure. Family houses of 4 different types.

READ MORE

Residential houses – st. Hellichova, Prague 1

bridge

Residential house and commercial spaces which include: reinforced concrete monolithic skeleton, underground parking, special foundations (piles), 26 flats, maisonettes, 5 storey building.

READ MORE

Rest home, Blatná

bridge

Rest home in Blatná includes 70 flats, canteen, precast skeleton construction, 4 storey building.

READ MORE

Reconstruction of admin. building

bridge

Reconstruction of administrative object no.17 for the company PRAŽSKÁ PLYNÁRENSKÁ includes: protected memorable object, reconstruction of interior and exterior, combination of steel and glass, built- in steel skeleton, stabilization of foundation conditions – pressure grouting.

READ MORE

Waste water treatment plant Kdyně

bridge

Construction of WWTP in Kdyně and Hluboká, sewerage system of the villages which included 9 km of sewerage system, 2 waste water treatment plant objects and supply of technology.

READ MORE

Residence Nikolajka, Prague 5

bridge

Residential house „NIKOLAJKA“ in Prague 5 includes 35 luxury flats, reinforced concrete monolithic skeleton, foundation on piles, complicated drainage system, 2 storeys of underground parking, 5 storey building.

READ MORE

Residential houses, st. Kloboučnická, Prague 4

bridge

Residential house in st. Kloboučnická and Bartoškova in Prague 4 includes 109 flats, 8 storey buildings, reinforced concrete monolithic skeleton, underground parking, maisonettes.

READ MORE

Residential house in Prague – Trója

bridge

Residential house in Trója includes 40 flats, precast skeleton construction, precast staircase, 5 storey building, underground parking, borehole piles foundation.

READ MORE

Residential house Barrandovský dvůr

bridge

Residential house „Barrandovský dvůr“ in Prague 5 includes 124 gallery flats, 7 storey buildings, reinforced concrete monolithic skeleton, special foundation (piles), 2 storeys of underground parking.

READ MORE

Residence Neklanova, Prague 2

bridge

Residential house in st. Neklanova in Prague 2 includes 37 flats, 7 storey building, reinforced concrete monolithic skeleton, underground parking, special foundation.

READ MORE

Viza auto CZ – Plzeň

bridge

Factory building construction includes precast framework, infrastructure development, steel – fibre – reinforced concrete industrial floor with karborundum.

READ MORE

Rest home Divišov

bridge

Brick facility, POROTHERM, includes 42 flats.

READ MORE

Construction of an Express Road S7, section: Skarżysko-Kamienna - Występa

Tölgyes condominium Project

bridge

Complete project include 6 different buildings and landscaping of the biggest and the most dynamic district in Budapest called Kelenföld. Basic parameters: Number of buildings: 6  Number of flats: 334  Underground parking : 7 000 m2  Shops: 400 m2  Size of storey: 21 700 m2

READ MORE

South-Balaton és Sió-Valley Waste Management System

bridge

Execution of 3 regional waste deposit landfills 4 pcs of waste transfer stations, 8 pcs of composting yard, 17 pcs of waste yards, 805 pcs of waste islands according to European Union standards of environmental regulations.

READ MORE

West-Balaton Waste Management System

bridge

Closing and covering, re-cultivation according to EU regulations 99 pcs of waste deposits on Regional Township.

READ MORE

Sajó-Bódva Valley Regional Solid Waste Handling

bridge

Designing and executing of 7 pieces of waste-handling yard in Kazincbarcika I-II., Edelény; Szendrõ; Szikszó; Putnok és Nyékládháza townships in modern, safe way, in compliance with the European Union’s environmental protection regulations. Execution of 7 sites waste yards rallied off with fence, supplied with portal containers. Size of the waste yards: 1000-2000 m2.

READ MORE

Regional Waste Management Projekt of Miskolc

bridge

Construction of one waste-handling center filling regional part in Hejőpapi non-urbanized area, and three landfill sub-centers in the territory of Miskolc in compliance with the European Union’s environmental protection regulations, whose aim is to handle the communal waste of 34 regions. Moreover the project included a closing up of the existing landfills in 19 regions and their re-cultivation in compliance with environmental protection regulations.   Basic parameters: Re-cultivating landfill of 12 townships with the total quantity of the transported waste: 188 200 m3...

READ MORE

Homokhátság Regional Municipal Waste Management Projekt – Waste Handling Center of Felgyõ and Kiskunhalas

bridge

Waste-handling centers filling regional part, situated in Kiskunhalas and Felgyő each, whose aim is to handle the municipal waste of 345.000 inhabitants of 82 townships in modern, safe way, in compliance with the European Union’s environmental protection regulations. Basic parameters: Felgyõ                    Kiskunhalas stockpile                                                 19 228 m3    ...

READ MORE

Tiszatenyő (bez) - Mezőtúr (kiz)

bridge

Reconstruction of the missing second main track along railway line Tiszatenyő (incl.)- Mezőtúr (excl.) have been completed within the Stage II of Phase 1 of the reconstruction of the Budapest-(Cegléd-Szolnok)-Lőkösháza regular gauge railway line - without suspending railway traffic. The project was aimed to ensure 225 kN axis load and 160 km/h speed along the entire railway line. Complex reconstruction of the Tiszatenyő station without suspending railway traffic, replacement of bypasses at the station with sub- and superstructure works and the installation of...

READ MORE